Gas to be intersected between 1200 to 1400 metres with anticipated 30bcf Oil to be intersected at about 650 metres Third well to be drilled sideways from existing position. Should mean no demob/remob.
CIG Price at posting:
0.0¢ Sentiment: Buy Disclosure: Held