From the last announcement on the 18th:
"The well was shut-in, a few feet below the top of the Miogyp,
to allow the removal of oil contaminated mud prior to continued drilling. This operation is being completed at the
present time. It is expected to take approximately 18 hours to reach total depth once drilling resumes. Formation evaluation logs will be run at that time after which production casing will be installed"
Has drilling resumed or are they still removing oil contaminated mud?
- Forums
- ASX - By Stock
- GGP
- next announcement...
next announcement...
-
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GGP (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online