URANIUM KING TO BE AUSTRALIA’S NEXT LISTED ASX URANIUM PRODUCER APEX SCOPING STUDY CONFIRMS ECONOMICALLY ROBUST MINING OPERATION AT APEX-LOWBOY. PRODUCTION ESTIMATED TO COMMENCE IN 2009. HIGHLIGHTS • Apex Scoping Study confirms potential of Apex – Lowboy to host an economically robust open cut, heap leach uranium mining operation. • Estimated production of 1.4 million pounds of uranium oxide production with around 1.0 million pounds produced in initial 2 years of operation. • Production estimated to start in 2009. Permitting process has commenced. • Projected EBIT of $87 million (at $US100 per pound uranium) with IRR of 71%. • Scoping Study highlighted significant potential at depth at Apex and Lowboy with +10 million pounds targeted. This could extend the mine life by a significant number of years. • Drilling of targeted resource expected to commence in December quarter 2007
UKL Price at posting:
0.0¢ Sentiment: Hold Disclosure: Held