If PIR can see its way to providing an actual resource estimate in their next drill results ann it would be a smart move, I think the last bit of selling after the drill results was because not all of us can do the sums.
Can anyone doa bit of a back of the envelope type thing and give a cps value based on say 1moz versus 1.2moz etc etc. A bit academic if they don't actually say it in the ann, but would be good to know anyways.
If PIR can see its way to providing an actual resource estimate...
Add to My Watchlist
What is My Watchlist?