If PIR can see its way to providing an actual resource estimate in their next drill results ann it would be a smart move, I think the last bit of selling after the drill results was because not all of us can do the sums.
Can anyone doa bit of a back of the envelope type thing and give a cps value based on say 1moz versus 1.2moz etc etc. A bit academic if they don't actually say it in the ann, but would be good to know anyways.