Where is the spod going if it's not being loaded on ships. At 70-80% nameplate surely the hinges at the qube shed are about to burst open with spod
They produce it and transport it as quick and as practical.......
Infastructure also helps.......Construction is happening with Qube Logistics newest Port Hedland Lithium Storage sheds in line with the Ramp up of increasing deliveries to the current sheds from the Pilgangoora region.
Multiple Port shipments a month will happen as production at both the mines comes closer to Nameplate status and Storage at Port Hedland is able to accommodate in the Port the increasing volumes of the White Gold.
- Forums
- ASX - By Stock
- Next shipment
Where is the spod going if it's not being loaded on ships. At...
-
-
- There are more pages in this discussion • 415 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add 1MC (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.9¢ |
Change
0.001(3.57%) |
Mkt cap ! $8.789M |
Open | High | Low | Value | Volume |
2.8¢ | 3.0¢ | 2.8¢ | $15.23K | 508.1K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 172413 | 2.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.1¢ | 523991 | 8 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 172413 | 0.029 |
9 | 421555 | 0.028 |
1 | 384615 | 0.026 |
1 | 35000 | 0.025 |
1 | 41708 | 0.023 |
Price($) | Vol. | No. |
---|---|---|
0.031 | 523991 | 8 |
0.032 | 38813 | 2 |
0.033 | 8100 | 2 |
0.034 | 269773 | 1 |
0.035 | 153566 | 1 |
Last trade - 15.59pm 13/11/2024 (20 minute delay) ? |
Featured News
1MC (ASX) Chart |