Thanks for the link. Interesting preso. Key points
* very bullish as the 3rd largest greenfield resource with top 2 in DRC and Kazakhstan
* DFS aim - 750kt pa mining for 4.5ktpa tin concentrate
* Ore-sorting and high pressure grinding rolls will improve economics
* Capex and Opex will be less than previous DFS.
* 6-9 months to deliver funding
* 15 months to build
I have attached an old DFS with figures.
If they are to deliver, then the new DFS will have a lower average throughput and production but needs to have capex under $150m and C3 costs under $13,000/tonne