MRP have had some nice results out this morning. If you view the sections mining of this zone would require a huge capital cost as there is at least 150 to 200m of waste to remove before you get into the mineralisation. Plus the waste between the 2 pits as well.
Results would need to continue to be strong, although I can't see this future mining venture showing economic success given the capital costs - the previous low cash costs should not be used as a guide given the enormity of the capital required now to develop it.
MRP have had some nice results out this morning. If you view the...
Add to My Watchlist
What is My Watchlist?