danbradster,
"Lynas stated that it achieved these production rates despite heavy rainfall in early December, which cased flooding and restricted access in and around its Lynas Advanced Material Plant (LAMP) cracking facility."
Has the article changed since dan posted?
Mining Australia.
"Lynas stated that it achieved these production rates despite heavy rainfall in early December, which cased flooding and restricted access in the city near its Lynas Advanced Material Plant (LAMP) cracking facility."
Read both carefully. Clearly a difference between the two.
Danbradster has misquoted the article.
- Forums
- ASX - By Stock
- LYC
- nice spin about ann
nice spin about ann, page-16
-
- There are more pages in this discussion • 16 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LYC (ASX) to my watchlist
(20min delay)
|
|||||
Last
$8.09 |
Change
0.070(0.87%) |
Mkt cap ! $7.561B |
Open | High | Low | Value | Volume |
$8.15 | $8.27 | $8.08 | $35.31M | 4.353M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 7192 | $8.08 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$8.10 | 4833 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 620 | 8.050 |
1 | 500 | 8.040 |
4 | 4222 | 8.030 |
1 | 100 | 8.020 |
2 | 742 | 8.010 |
Price($) | Vol. | No. |
---|---|---|
8.110 | 8945 | 1 |
8.120 | 22984 | 2 |
8.140 | 1000 | 1 |
8.150 | 3078 | 2 |
8.170 | 12051 | 2 |
Last trade - 16.10pm 08/11/2024 (20 minute delay) ? |
Featured News
LYC (ASX) Chart |
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online