Calling something cherry picked isn’t good enough. That is a cop out. There is no substance to such a reply. Saying that the railcar test being built on existing slab means that the control too was on existing slab. Yet the control has cracked and Edencrete has not. If it just came down to bad workmanship then again the control slab cracked and the Edencrete didn’t. As for bad workmanship, this site has been putting up with bad workmanship for twenty years replacing slabs ever quarter? Seems like a bit of a stretch to think that was the case.
- Forums
- ASX - By Stock
- Nice Video
Calling something cherry picked isn’t good enough. That is a cop...
-
- There are more pages in this discussion • 16 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EDE (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $8.216M |
Open | High | Low | Value | Volume |
0.2¢ | 0.2¢ | 0.2¢ | $66.50K | 33.25M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 2729839 | 0.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.3¢ | 30428694 | 20 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 2729839 | 0.002 |
38 | 104325058 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.003 | 30428694 | 20 |
0.004 | 5420102 | 4 |
0.005 | 1200000 | 3 |
0.006 | 245010 | 2 |
0.008 | 3804000 | 2 |
Last trade - 15.19pm 06/11/2024 (20 minute delay) ? |
Featured News
EDE (ASX) Chart |