    One of the other big nickel-cobalt projects commenced this month as well:

    China Twenty Metallurgy Indonesia Huayue nickel-cobalt nickel smelting main project started

    Source: China 20th Metallurgical Group Author: Selected Works of Deng Qi Published: 2020 March 3 views:

    On March 1, China No. 20 Metallurgical Group's Huayue nickel-cobalt wet process project started.

    The project is located in Morowali Industrial Park, Sulawesi, Indonesia, and the contract period is 16 months. The scope of project participation includes the entire work content of one bidding section (high pressure acid leaching, cyclic leaching and pulp neutralization, CCD counter current washing, 10kV high voltage power distribution station in dense area, full-field dispatching and communication system, etc.) and three bidding sections.

    Construction content (five sub-items of nickel-cobalt hydroxide filtration and packaging, nickel hydroxide storage, limestone mill section, quick lime storage, and lime milk preparation). The project adopts a new production process. After the project is completed and put into operation, it will change the current industrial structure of the world's nickel and cobalt industry.

    Affected by the new crown virus epidemic, the Indonesian government has adopted epidemic control measures since February 15, 2020, resulting in a delay in domestic transportation materials, project managers, and site construction staff being unable to reach the construction site and other issues. In the early stage of the epidemic control measures, China No. 20 Metallurgical Group quickly carried out scientific deployment, promptly transferred manpower and materials from other Indonesian projects under construction, and set up a temporary project department to overcome a series of difficulties in the preparatory stage of construction. The project department received the transfer order to enter the site on February 21 and officially started construction on March 1. It only took eight days to complete the preparatory work before the start of the project, and fully ensured the smooth start of the project ceremony and the orderly follow-up construction. Advance.

    The smooth start of the construction ceremony fully demonstrated the overall planning and dispatching ability of China No. 20 Metallurgical Corporation when it encountered unexpected situations in overseas project construction. The project department will practice the responsibility concept of "Choose Twenty Metallurgical is to choose assured", carry forward the spirit of "no delay, no slackness in one day", and under the premise of guaranteeing quality and safety, aim for high quality and efficiency. Complete construction tasks and build Huayue nickel-cobalt project as scheduled.
 
watchlist Created with Sketch. Add AUZ (ASX) to my watchlist
(20min delay)
Last
0.7¢
Change
0.000(0.00%)
Mkt cap ! $9.789M
Open High Low Value Volume
0.8¢ 0.8¢ 0.7¢ $1.833K 252.9K

Buyers (Bids)

No. Vol. Price($)
36 25999748 0.7¢
 

Sellers (Offers)

Price($) Vol. No.
0.8¢ 1087459 9
View Market Depth
Last trade - 14.55pm 26/08/2024 (20 minute delay) ?
AUZ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.