Here Unfortunately for today's update this morning. But I was somewhat wrong that it will be a drop from 11-12,00t to 5,000t
Lanfranchi Operations post June 2015
Assuming a decision is made to commence production of the Jury-Metcalfe orebody this will see the Lanfranchi Operation transition from a base load of ore sourced from the Deacon orebody, currently expected to be depleted by the end of the June quarter 2015, to a base load of ore sourced from the Jury-Metcalfe orebody plus additional ore from Lanfranchi, Schmitz and Helmut South Extension orebodies. Assuming a decision to mine Jury-Metcalfe is made, steady state production could be achieved from Jury-Metcalfe during the September 2015 quarter at a rate of approximately 15,000t ore per month. The nominal mine life of Jury-Metcalfe is 16 months, based on the June 2014 Reserve. The transition to Jury-Metcalfe is expected to result in a reduced production profile at the Lanfranchi Operation from the current production levels (guidance for FY2015 is 11-12,000t Ni) to a production rate in the range of 5-6,000t Ni for FY2016. If the nickel price does not support mining the Jury-Metcalfe orebody, the Lanfranchi Operations will need to be restructured, with production post June 2015 significantly curtailed.
- Forums
- ASX - By Stock
- PAN
- Nickel on the run
Nickel on the run, page-13
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PAN (ASX) to my watchlist
|
|||||
Last
3.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $103.9M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
PAN (ASX) Chart |
Day chart unavailable
The Watchlist
CCO
THE CALMER CO INTERNATIONAL LIMITED
Anthony Noble, CEO
Anthony Noble
CEO
SPONSORED BY The Market Online