hey guys a bit of research might be a good idea
averbury has only started production in this quarter
they have produced 940 tonnes of nickel in that 3 months
the mine is supposed to produce 8500 tonnes a year
http://www.ozminerals.com/Operations/Mining-Operations/Avebury/Avebury-Mine-Overview.html
@ 940 for the quarter they are only half way there
operating costs are supposed to be around $2.20
check out page 15 of the alligiance's 2006 presentation to institutions
v
v
http://www.allegiance-mining.com.au/docs/Announcements/2006/ASXCaps-9.5.2006-Institutional%20Roadshow.pdf
costs are likely to drop from $6.30 to $2.50 once everything is up and running and fully operational.
- Forums
- ASX - By Stock
- nickel
hey guys a bit of research might be a good ideaaverbury has only...
-
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)