Normaly the FPSO contractor gets nothing until the FPSO has at least flowed oil and maybe not til the performance test is complete. The performance test is normaly 100 hours at maximum design rates if they are acheivable.
Avi
- Forums
- ASX - By Stock
- nido share and timing
Normaly the FPSO contractor gets nothing until the FPSO has at...
-
- There are more pages in this discussion • 15 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NDO (ASX) to my watchlist
(20min delay)
|
|||||
Last
86.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $196.1M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 1238 | 85.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
88.0¢ | 2000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 1238 | 0.850 |
2 | 15060 | 0.830 |
1 | 12269 | 0.815 |
1 | 2000 | 0.810 |
1 | 7700 | 0.805 |
Price($) | Vol. | No. |
---|---|---|
0.880 | 2000 | 1 |
0.900 | 15000 | 1 |
0.950 | 6000 | 1 |
0.970 | 10000 | 1 |
0.990 | 5000 | 1 |
Last trade - 16.12pm 04/10/2024 (20 minute delay) ? |
Featured News
NDO (ASX) Chart |
Day chart unavailable