NKP 0.00% 9.9¢ nkwe platinum limited

nkwe bfs

  1. 387 Posts.
    lightbulb Created with Sketch. 1
    Posted by admin on October 27, 2010

    The initial findings of a bankable feasibility study (BFS) of the Garatau platinum project, in South Africas Bushveld Complex, has upgraded the projects resource estimate by

    Nkwe Platinum (ASX: NKP) has highlighted an average production of between 240,000 and 400,000 tonnes per month with an initial mine life of + 40 years for the Garatau Project.

    Emerging platinum company Nkwe Platinum (ASX: NKP) has announced details of the bankable feasibility study on its Garatau Project, highlighting an average production of between

    Nkwe and Genorah are currently conducting a Bankable Feasibility Study (BFS) over the Properties and have already delineated a significant resource base of over 20 million

    http://mediaindonesia.co.cc/search/label/nkwe+bfs
 
watchlist Created with Sketch. Add NKP (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.