Posted by admin on October 27, 2010
The initial findings of a bankable feasibility study (BFS) of the Garatau platinum project, in South Africas Bushveld Complex, has upgraded the projects resource estimate by
Nkwe Platinum (ASX: NKP) has highlighted an average production of between 240,000 and 400,000 tonnes per month with an initial mine life of + 40 years for the Garatau Project.
Emerging platinum company Nkwe Platinum (ASX: NKP) has announced details of the bankable feasibility study on its Garatau Project, highlighting an average production of between
Nkwe and Genorah are currently conducting a Bankable Feasibility Study (BFS) over the Properties and have already delineated a significant resource base of over 20 million
http://mediaindonesia.co.cc/search/label/nkwe+bfs
- Forums
- ASX - By Stock
- nkwe bfs
Posted by admin on October 27, 2010The initial findings of a...
-
- There are more pages in this discussion • 29 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)