SBL 0.00% 0.1¢ signature metals limited

no feasibility needed cashedupbogan, page-17

  1. 722 Posts.
    lightbulb Created with Sketch. 2
    Sounds to me that the past year and a half has been in preperation for the feasibilty study. And that the next imformation is the cost af running the plant after full commisioning has taken place.
    I think it would be worse if they only stated, for the next year we will run this same level of tonnage.
    No we are expanding the plant increaseing tonnage,getting it all running at 90%,have ore to last as a year,have a lease that has been extened,Drilling at depth planned,investers putting up money to cover costs(in such a bear market),and gold being sold or stockpiled,and dont forget about the MAG
    Still things can happen, and that why I enjoy trading.
 
watchlist Created with Sketch. Add SBL (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.