M4M 7.41% 2.9¢ macro metals limited

No market love for Kogi as iron-steel project ignored, page-64

  1. 390 Posts.
    lightbulb Created with Sketch. 135
    This comment on the December 2021 scoping Study asx release. I wonder how things are progressing we dont hear a whole lot.
    "The remainder of the feasibility program is expected to be completed during the second half of 2022 which is running on schedule given the breadth and comprehensive nature of these studies."
 
watchlist Created with Sketch. Add M4M (ASX) to my watchlist
(20min delay)
Last
2.9¢
Change
0.002(7.41%)
Mkt cap ! $107.9M
Open High Low Value Volume
2.8¢ 3.1¢ 2.8¢ $487.3K 16.45M

Buyers (Bids)

No. Vol. Price($)
7 1144826 2.9¢
 

Sellers (Offers)

Price($) Vol. No.
3.0¢ 1281885 4
View Market Depth
Last trade - 10.55am 22/05/2024 (20 minute delay) ?
Last
3.0¢
  Change
0.002 ( 9.26 %)
Open High Low Volume
2.8¢ 3.1¢ 2.8¢ 8383442
Last updated 11.28am 22/05/2024 ?
M4M (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.