That presentation was August before the costs were finalised. Show me something since.
My point is that as Trommel has informed us that mns ditched the consultants and went in house once the EP costs were established and deemed excessive.
- Forums
- ASX - By Stock
- No off takes
That presentation was August before the costs were finalised....
-
-
- There are more pages in this discussion • 46 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MNS (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $50.37M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
MNS (ASX) Chart |
Day chart unavailable