MNS 0.00% 4.2¢ magnis energy technologies ltd

That presentation was August before the costs were finalised....

  1. 361 Posts.
    lightbulb Created with Sketch. 181
    That presentation was August before the costs were finalised. Show me something since.
    My point is that as Trommel has informed us that mns ditched the consultants and went in house once the EP costs were established and deemed excessive.
 
watchlist Created with Sketch. Add MNS (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.