Hi Th,,,,,
We should receive a " Quarterly Activities and Cashflow Report " as at, and on 30th July 2008..
Given the more accurate information released by the company, that the desired target zone in Stewart-1 is not just a few hundred feet, but closer to one thousand feet,the prefered option would be a new vertical well IMO.!
Although not technically difficult, the cost to go that distance would be right up there..!!
The horizontal drilling does'nt go at 90 degrees, but in a large steady arch, and would have to begin a fair way up the well, which could possibly triple the actual drilling distance to 3000ft, and at a cost of possibly "double pluss" that of vertical drilling..!!
The best possible outcome for shareholders would be a sufficient flow rate, from the Jackson interval, to recoup the well cost, and then go again with a vertical,, direct to the target zone..!!
The pipeline is only a stones-throw from the well, so that connection cost won't be an issue..!!
Will we get that outcome,,?? Wish i knew..!!
I do know that it takes no time at all,, to test nothing at all..!!
Cheers !
- Forums
- ASX - By Stock
- no problems so far
Hi Th,,,,, We should receive a " Quarterly Activities and...
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AZZ (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online