Expected timetable for ECE issue(Tranche 2), from 13 Dec Ann.
"Once the condition precedents have been satisfied, the settlement of Tranche 2 is expected to be completed during Q1 2013, although later in the Quarter than previously expected"
"second tranche (“DB Tranche 2”) will settle immediately following the re-commencement of Jiangsu
operation, anticipated to be early February 2013."