ZMM 15.8% 1.6¢ zimi limited

noble clyde fleet report - palta, page-2

  1. 35,149 Posts.
    lightbulb Created with Sketch. 961
    Hi Dude That is good thinking but they have to do tests on the Blow Out preventors when first installed and also at various stages during the drilling. This would explain the time delay . I would not like to hear that the BOPs have failed whilst in the Hydrocarbon Zone of interest Cheers Towie
 
watchlist Created with Sketch. Add ZMM (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.