BPH 0.00% 1.8¢ bph energy ltd

You are kidding. It takes 3 to 4 years plus to build a LNG...

  1. 165 Posts.
    lightbulb Created with Sketch. 38
    You are kidding.
    It takes 3 to 4 years plus to build a LNG terminal.
    Producing gas by 2022 and it's nearly 2021 now.
    LNG gas terminals take time to build.
 
watchlist Created with Sketch. Add BPH (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.