One of the many uses of the desal plant is to supply H2O to Olympic Dam.
BHP are willing to go on the hook for $100 m if the feasibility money is spent and they elect not to proceed.
It's quite an undertaking where the cost was $2.3 billion in 2010 to construct a similar sized plant for Sydney.
Current estimated cost therefore using construction index figures for the present time is +37 % as at 2023
In my opinion there is no need to cross fingers.
- Forums
- ASX - By Stock
- Northern Water Supply Project - Cape Hardy Desalination Plant
One of the many uses of the desal plant is to supply H2O to...
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IRD (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.6¢ |
Change
-0.001(1.30%) |
Mkt cap ! $62.78M |
Open | High | Low | Value | Volume |
7.7¢ | 7.7¢ | 7.6¢ | $8.965K | 116.5K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 97000 | 7.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.7¢ | 15914 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 97000 | 0.070 |
1 | 10000 | 0.060 |
1 | 75000 | 0.058 |
1 | 89286 | 0.056 |
1 | 39728 | 0.055 |
Price($) | Vol. | No. |
---|---|---|
0.077 | 15914 | 1 |
0.078 | 71510 | 2 |
0.079 | 60000 | 1 |
0.080 | 103333 | 2 |
0.081 | 750 | 1 |
Last trade - 16.10pm 15/05/2024 (20 minute delay) ? |
|
|||||
Last
7.7¢ |
  |
Change
-0.001 ( 1.32 %) |
|||
Open | High | Low | Volume | ||
7.7¢ | 7.7¢ | 7.7¢ | 25614 | ||
Last updated 10.21am 15/05/2024 ? |
Featured News
IRD (ASX) Chart |
The Watchlist
SS1
SUN SILVER LIMITED
Gerard O’Donovan, Executive Director
Gerard O’Donovan
Executive Director
SPONSORED BY The Market Online