Mantle did not say as much in any asx ann but a local paper ran a story and quoted the project manager as saying it cost them over a million to get it permitted and studies completed.
By memory $300,000 was all Mantle paid fo Norton. Gold price was a few hundred lower then.
Lots of shallow gold for Metalbank to mine at Triumph. But getting something jorced, feasibility study and permits e.t.c. is probably going to cost Metalbank more $$$ than it would to buy Norton. And over a year before mining starts, whereas with Norton it is just about ready to go.
Just my gut feeling that there is a lot of outcropping shallow gold of decent grades to mine at Triumph but not convinced an economical gold ore body will be found at depth.
- Forums
- ASX - By Stock
- Norton's Gold Mine
Mantle did not say as much in any asx ann but a local paper ran...
-
- There are more pages in this discussion • 12 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MBK (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $5.466M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 837393 | 1.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.5¢ | 40567 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 837393 | 0.014 |
1 | 1600 | 0.012 |
2 | 91700 | 0.011 |
1 | 100000 | 0.009 |
1 | 120000 | 0.008 |
Price($) | Vol. | No. |
---|---|---|
0.016 | 93980 | 2 |
0.017 | 459965 | 4 |
0.018 | 40000 | 1 |
0.020 | 6875 | 1 |
0.022 | 35000 | 1 |
Last trade - 12.05pm 18/09/2024 (20 minute delay) ? |
Featured News
MBK (ASX) Chart |
Day chart unavailable