Thanks Agent 86.
A well written accurate summary of events.
A few corrections if I may
IP Study was done indicating they had drilled and missed the conductor at M2.
Further drilling at M2 is planned but is not a priority.
The U1 Prospect may be drilled next year, but again this is not a priority.
Beverley 4 Mile is the priority
Add to My Watchlist
What is My Watchlist?