All the more reason to announce the PFS results for T1/Silver Ray (already 6 months late) before the last day of the month - under Tyson every announcement is either late or at the last minute. I know for a fact from projects I have been associated with (of similar scope and size) that a full Feasibility Study can be completed in 6 months.
With no news from Wirlong I presume the latest drilling was underwhelming. Why didn't they drill down dip of the main lens?
- Forums
- ASX - By Stock
- PEX
- Nothing Holding Us Back...
Nothing Holding Us Back..., page-49
-
- There are more pages in this discussion • 11 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PEX (ASX) to my watchlist
|
|||||
Last
14.0¢ |
Change
0.005(3.70%) |
Mkt cap ! $81.35M |
Open | High | Low | Value | Volume |
14.0¢ | 14.0¢ | 14.0¢ | $5.6K | 40K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 30438 | 13.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
14.0¢ | 4464 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 30438 | 0.135 |
2 | 49944 | 0.130 |
3 | 622900 | 0.125 |
1 | 25000 | 0.120 |
2 | 54400 | 0.115 |
Price($) | Vol. | No. |
---|---|---|
0.145 | 45073 | 3 |
0.150 | 25799 | 3 |
0.155 | 194087 | 4 |
0.160 | 133500 | 5 |
0.165 | 18180 | 1 |
Last trade - 14.16pm 14/06/2024 (20 minute delay) ? |
|
|||||
Last
14.0¢ |
  |
Change
0.005 ( 0.00 %) |
|||
Open | High | Low | Volume | ||
14.0¢ | 14.0¢ | 14.0¢ | 14256 | ||
Last updated 14.16pm 14/06/2024 ? |
Featured News
PEX (ASX) Chart |