    OPERATIONS UPDATE
    Target Energy Limited (“Target”) (ASX CODE: TEX) is pleased to provide the following operations update. All
    reported depths are measured depths below the Rotary Table (RT) on the rig floor.
    VINCENT #1 (BANDITO PROSPECT)
    Report Date: 7:00 pm 02/07/08 (Western Aust Standard Time) /
    6:00 am 02/07/08 (USA Central Daylight Time)
    Current Depth: 3,386.4 metres RT.
    Progress: Drill ahead from 3,052.9m to 3,368.1m. Run intermediate wireline logs. Drill
    ahead to 3,386.4m. Run and cement 244mm (9 5/8”) intermediate casing.
    Prepare to drill ahead.
    Hydrocarbon
    Indications Hydrocarbon shows will only be reported after wireline logs have been run and
    evaluated at the Total Depth of the well.
    Primary and Secondary
    Targets The Bandito prospect is targeting up to 42.4 Bcf (Billion cubic feet) of potential
    recoverable gas in Oligocene age “Bol mex” sands, and will be drilled to a
    depth of 3,932 metres (12,900 feet). Drilling is expected to take approximately
    five weeks.
    Target Energy will earn a 15% Working Interest in the well (subject to completion of earning phase).
    PINE PASTURE #2 (EAST CHALKLEY) – FINAL REPORT
    Report Date: 7:00 pm 01/07/08 (Western Aust Standard Time) /
    6:00 am 01/07/08 (USA Central Daylight Time)
    Current Depth: 2,794.9 metres RT (Total Depth).
    Progress: Drill ahead in 251mm (9 7/8 inch) hole from 2,836.5m to 2,794.9m. Run
    wireline logs. Run and cement 179mm (7 inch) production casing. Install tubing
    head. Rig released 1030 hrs 30 June 2008 (CDT).
    Comment As previously advised, initial log analysis has identified approximately 9.5
    metres of net oil pay in the Alliance W2 sand at 2,923.0 metres (measured
    depth), which is in line with pre-drill expectations. Additional potential pay has
    also been recognised in the above-lying Alliance W1 sands.
    Measured Depth (metres) Zone Net pay
    2,890.1 Alliance W1 3.4 metres
    2,923.0 Alliance W2 9.5 metres
    The well is to be completed as an oil producer from the W2 sand, with
    completion and flow-testing of the well expected to be underway in
    approximately two weeks.
    Target has a 25% Working Interest in the Pine Pasture #2 well.

    Looks very positive news
 