Due this month
1. DFS and Resource Upgrade for Dragues Reef
2. Assay are due from 7 holes in Plums Lode Drilling campaign. All holes struck mineralisation. Looks encouraging first hole had 12.6 m @ 9.9 g/t ~80m.
3. Possibly futher assays from current drill program
In October CRC raised $4.25 million in a share placement @ 17 cents.
Current resource estimate = 286000 oz @ 6g/t
Target resource = 500000 oz
Planned production b4 end of 2011
With a positive DFS, resource upgrade and drill results from Plum Lode I'm thinking a re-rating is on the cards
TA it looks like an ascending triangle
Support 16c
Resistance 23.5c
Target 31c
Due this month1. DFS and Resource Upgrade for Dragues Reef2....
Add to My Watchlist
What is My Watchlist?