re: berge helene hardmano,
if it is the berge helene wpl has contracted, it is a single hull.
built in france 1976,modified to an fpso in 2002 singapore,production capacity designof 60,000 bpd,with capacity to lift production.
asea brown boveri designed the processing facilities.
the vessel has a shelf life of 15 years.
cheers