SOC 0.00% 11.0¢ soco corporation ltd

Thank you for the update. If they started drilling Last week and...

  1. 279 Posts.
    Thank you for the update. If they started drilling Last week and doing 80m a day they should be at 550-600m. They entered the pipe at 335m as expected. So 200depth could be 40-50m width which would be a great result for the week. Grades should be the same or better as it moves away from the pipe.
 
watchlist Created with Sketch. Add SOC (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.