GGE 20.0% 0.4¢ grand gulf energy limited

now we wait!!, page-4

  1. 3,469 Posts.
    lightbulb Created with Sketch. 1

    West K ; Rig Released; Waiting on Completion Rig,

    12/17/2012 06 11203 DRLD TO 11203'; LOGGED; RAN 7" CSG TO 11203' W/ 1017 SXS; INSTALLED DRY HOLE TREE; WOCR; RR 12/18/12;

    Pls do not misinterpret "Dry hole Tree "

    Simply put:...
    When an oil well is drilled. At the surface, a "Xmas-Tree" is fabricated on the casing and tubing strings of piping of the bore hole. This is a system of valves and safety devices necessary for the safe operation and control of the well fluids.

    Waiting for Flow testing .Expect Coy ann .

    R15
 
watchlist Created with Sketch. Add GGE (ASX) to my watchlist
(20min delay)
Last
0.4¢
Change
-0.001(20.0%)
Mkt cap ! $8.380M
Open High Low Value Volume
0.4¢ 0.5¢ 0.4¢ $2.77K 630.0K

Buyers (Bids)

No. Vol. Price($)
15 12457009 0.4¢
 

Sellers (Offers)

Price($) Vol. No.
0.5¢ 2069965 6
View Market Depth
Last trade - 10.04am 30/08/2024 (20 minute delay) ?
GGE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.