West K ; Rig Released; Waiting on Completion Rig,
12/17/2012 06 11203 DRLD TO 11203'; LOGGED; RAN 7" CSG TO 11203' W/ 1017 SXS; INSTALLED DRY HOLE TREE; WOCR; RR 12/18/12;
Pls do not misinterpret "Dry hole Tree "
Simply put:...
When an oil well is drilled. At the surface, a "Xmas-Tree" is fabricated on the casing and tubing strings of piping of the bore hole. This is a system of valves and safety devices necessary for the safe operation and control of the well fluids.
Waiting for Flow testing .Expect Coy ann .
R15
- Forums
- ASX - By Stock
- now we wait!!
West K ; Rig Released; Waiting on Completion Rig,12/17/2012 06...
-
-
- There are more pages in this discussion • 74 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GGE (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $8.576M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
12 | 7336169 | 0.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.4¢ | 3561124 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
12 | 7336169 | 0.003 |
13 | 8033675 | 0.002 |
9 | 10700009 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.004 | 3561124 | 6 |
0.005 | 6054097 | 18 |
0.006 | 2985166 | 3 |
0.007 | 1563480 | 2 |
0.008 | 1041884 | 3 |
Last trade - 11.10am 05/11/2024 (20 minute delay) ? |
Featured News
GGE (ASX) Chart |
Day chart unavailable