I know they have started, but I would have though the correct way to go about it is to get all required approvals in place before contracting the rig and tug for the job.
I have been in the offshore OIL& GAS biz for thirty years, and I find this all a bit weird.
If they do not get approval from the FED�s, what are they to do?, putting the rig on standby will cost heaps while they wait for the Fed government dep�t to OK the drilling permit?
- Forums
- ASX - By Stock
- nsw dpi asset energy enviro plan summary
I know they have started, but I would have though the correct...
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MMR (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $3.236M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
MMR (ASX) Chart |
Day chart unavailable
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online