Yep, I read that as a minimum capacity of 30MW / 240MWh
We need Genex to hurry up with KPH and get on the NSW gravy train! I've said in other threads here and on Infigen threads - NSW by a long margin presents the very best opportunities for renewable energy development due to the relatively rapid and immense transition that is going to occur over the course of a decade from the late 2020s.
It's a very exciting time to be a holder of an Australia RE company developing solar, wind, batteries and pumped hydro (it's really such a shame Infigen was sold to Iberdrola for a bargain..!). My hopes are that Genex and Tilt can lead the charge from the Australian side. I'm certain that Genex have learnt a hell of a lot along the way with KPH, and will be able to speed the process up next time round.
- Forums
- ASX - By Stock
- NSW electricity infrastructure roadmap - focus on pumped hydro
Yep, I read that as a minimum capacity of 30MW / 240MWhWe need...
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)