TVN 7.27% 5.1¢ tivan limited

NT EIS, page-47

  1. 4,621 Posts.
    lightbulb Created with Sketch. 3200
    Wonder when TNG will update holders with the current progress.

    http://www.aspecthuntley.com.au/asxdata/20160705/pdf/01754714.pdf
    DETAILED WATER BORE DRILLING WITH PRODUCTION WELLS COMMENCES AT MOUNT PEAKE AQUIFER FOR MINE DEVELOPMENT PLANNING
     A program of water bore drill testwork has commenced at TNG’s flagship 100%-owned Mount Peake Vanadium-Titanium-Iron Project in the Northern Territory as part of mine development requirements.
     The specialist drilling has been designed to provide additional information for the bore field modelling included in the Feasibility Study following the discovery of the aquifer by TNG last year.
     Works will encompass detailed pump testing, water sampling, aquifer modelling, assessment and reporting.  Results will form a part of the Supplement Report for the Environmental Impact Study (EIS) for the Mount Peake development, to be submitted later this year.

    The commencement being 6 weeks ago... Wonder how long it takes to drill water bores/production wells and then do this....
    GHD will prepare an updated groundwater model and design of the operational bore field from which yield values will be obtained for the proposed bore field in order to establish the life-of-mine mining and ancillary water requirements for the whole operation.
 
watchlist Created with Sketch. Add TVN (ASX) to my watchlist
(20min delay)
Last
5.1¢
Change
-0.004(7.27%)
Mkt cap ! $90.19M
Open High Low Value Volume
5.6¢ 5.6¢ 5.1¢ $125.6K 2.341M

Buyers (Bids)

No. Vol. Price($)
1 116427 5.1¢
 

Sellers (Offers)

Price($) Vol. No.
5.5¢ 143714 2
View Market Depth
Last trade - 16.10pm 11/11/2024 (20 minute delay) ?
TVN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.