NTL 0.00% 2.1¢ new talisman gold mines limited

NTL Talisman Mine/Pilot Plant Visit - June 2019, page-2

  1. 10,959 Posts.
    lightbulb Created with Sketch. 1768

    Ore piles


    The old shafts that hadn’t been closed off were filled with stored ore which will, seemingly, be removed for processing when the plant is ready to do so. There was 5 or 6 of them just chocka with material.


    https://hotcopper.com.au/data/attachments/1614/1614272-4408558e8da4ada3d497d46cacfda0de.jpg

    Ore



    https://hotcopper.com.au/data/attachments/1614/1614278-9bc909475d83a544954ba6178428f966.jpg

    Ore

    https://hotcopper.com.au/data/attachments/1614/1614274-13b0b6a840868b7e6e6349501ad2c8f2.jpg

    Ore


    https://hotcopper.com.au/data/attachments/1614/1614275-8a95bba6d9c075a508b7f8d93adf48ea.jpg

    Ore


    Further my discussions with (and reading Hot Copper posts to) Matt Hill, he does make a good point. They have done a lot of work. Comparing the amount of work NTL has done with what other mining companies seem to do with $2m, I can see what he meant when he said go down and take a look. Compared to my last visit (which coincidentally was around the last capital raising) they have completed the mine ready for extraction. I believe them when they say it’s ready to start pulling ore out for bulk sampling.

    Last edited by robbo24: 27/06/19
 
watchlist Created with Sketch. Add NTL (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.