9% of VIC energy requirements all built & online within 3 years.
https://reneweconomy.com.au/works-begin-on-second-stage-of-golden-plains-wind-farm-largest-in-southern-hemisphere/amp/
VIC ALP have already ruled out the proposed Gippsland nuclear power plant not planned to be online for another 12-14 years, more likely to be double that time.
- Forums
- Political Debate
- Nuclear plant sites
9% of VIC energy requirements all built & online within 3...
-
- There are more pages in this discussion • 300 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Featured News
The Watchlist
RCE
RECCE PHARMACEUTICALS LTD
James Graham, CEO
James Graham
CEO
Previous Video
Next Video
SPONSORED BY The Market Online