SLX silex systems limited

"CSIRO has come up with an estimated construction cost for a...

  1. 506 Posts.
    lightbulb Created with Sketch. 40
    "CSIRO has come up with an estimated construction cost for a 1000 MW nuclear plant of at least $A8.6 billion," - So Australia could replace its current fleet of 21 GW of coal-fired power generators fir under $200 billion, and that fleet is currently providing around 60% to 70% of energy to the NEM. Don't confuse generation capacity with energy delivered. You have to apply the capacity factor.

    The estimated LCOE figures of $163/MWh-$264/MWh. I'm pretty sure these are the figures that have been challenged by the Centre for Independent Studies (CIS) because they assume a nuclear power plant has a life of only 30 years (more likely 60 to 80 years) and a capacity factor of a bit over 50% when baseload plants in Australia typically have a load factor of around 75%, which could increase with overnight EV charging and use of pumped hydro systems currently being built.

    "Australia would need to exceed the highest nuclear build rates ever achieved." - Hardly. France had a much more rapid build out of its nuclear fleet in the 70's and 80's.

    In summary, I think the text you appear to have lifted from somewhere is misleading.

 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
$4.08
Change
0.330(8.80%)
Mkt cap ! $971.4M
Open High Low Value Volume
$3.77 $4.08 $3.77 $3.291M 828.0K

Buyers (Bids)

No. Vol. Price($)
1 15535 $4.03
 

Sellers (Offers)

Price($) Vol. No.
$4.10 9400 2
View Market Depth
Last trade - 16.10pm 24/06/2025 (20 minute delay) ?
SLX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.