SLX 0.45% $6.60 silex systems limited

https://www.msn.com/en-au/news/other/chris-bowen-s-nuclear-claim-...

  1. 20,140 Posts.
    lightbulb Created with Sketch. 1777
    https://www.msn.com/en-au/news/othe...id=56765f072878466cb4270fb7c492d742&ei=27

    The Australian Nuclear Science and Technology Organisation website has contradicted Climate Change and Energy Minister Chris Bowen’s claim it would take nearly two decades to build a nuclear reactor in Australia.
    Speaking to Sky News Political Editor Andrew Clennell, Shadow Energy Minister Ted O’Brien claimed that experts say a nuclear reactor could be built in Australia within 10 years.

    Mr Bowen refuted his claims in an interview with the ABC.
    “[In] the United States, with a very developed regulatory regime, with a very developed nuclear industry, the nuclear leader of the world, the average build time of a nuclear power plant in the United States has been 19 years,” the minister said.
    But the Australian Nuclear Science and Technology Organisation says in a section on its website about small modular reactors: “An SMR has a projected construction time of three to five years, while a large reactor takes six to 12 years.”
    Sky News Australia understands the experts Mr O’Brien was quoting are from the US, Britain and Australia.
    Mr O’Brien does not deny that some time would have to be spent setting up a nuclear regulator first.
 
watchlist Created with Sketch. Add SLX (ASX) to my watchlist
(20min delay)
Last
$6.60
Change
-0.030(0.45%)
Mkt cap ! $1.570B
Open High Low Value Volume
$6.59 $6.61 $6.53 $271.5K 41.22K

Buyers (Bids)

No. Vol. Price($)
8 1525 $6.59
 

Sellers (Offers)

Price($) Vol. No.
$6.61 1796 6
View Market Depth
Last trade - 10.24am 17/05/2024 (20 minute delay) ?
Last
$6.62
  Change
-0.030 ( 0.04 %)
Open High Low Volume
$6.56 $6.64 $6.53 7549
Last updated 10.43am 17/05/2024 ?
SLX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.