TVA chose GE-Hitachi’s (GEH’s) BWRX-300 because it is based on light water reactor (LWR) technology, Lyash said. “While we will continue to support and examine all of the various SMR designs being proposed, we believe that light-water SMR designs, which are closely related to the current generation of TVA’s large nuclear units, are more mature and closer to commercial deployment within the next decade,” he said. “For that reason, we are currently in discussions with GE-Hitachi to support their BWRX-300 light-water SMR design, which will help inform a future decision about potential deployment.”The BWRX-300 is a 300-MW boiling water reactor (BWR) that the Wilmington, N.C.–based GEH launched in 2017. The reactor design is the 10th evolution of GE’s BWR technology, and GEH says it represents “the simplest, yet most innovative BWR design since GE began developing nuclear reactors in 1955.”
- Forums
- ASX - By Stock
- Nuclear Power
TVA chose GE-Hitachi’s (GEH’s) BWRX-300 because it is based on...
-
-
- There are more pages in this discussion • 1,259 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BOE (ASX) to my watchlist
(20min delay)
|
|||||
Last
$3.29 |
Change
-0.050(1.50%) |
Mkt cap ! $1.347B |
Open | High | Low | Value | Volume |
$3.40 | $3.41 | $3.25 | $13.86M | 4.201M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 8076 | $3.27 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$3.30 | 24504 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 8076 | 3.270 |
1 | 2436 | 3.260 |
2 | 6236 | 3.250 |
5 | 101889 | 3.240 |
9 | 47781 | 3.230 |
Price($) | Vol. | No. |
---|---|---|
3.300 | 24504 | 4 |
3.310 | 14252 | 2 |
3.320 | 34547 | 3 |
3.350 | 4400 | 2 |
3.360 | 6250 | 2 |
Last trade - 16.10pm 30/09/2024 (20 minute delay) ? |
Featured News
BOE (ASX) Chart |