"Once completed, the Changjiang ACP100 reactor will be capable of producing 1 billion kilowatt-hours of electricity annually, enough to meet the needs of 526,000 households.
The reactor is designed for electricity production, heating, steam production or seawater desalination.CNNC announced in July 2019 the launch of a project to construct an ACP100 reactor at Changjiang.
The site is already home to two operating CNP600 PWRs, while the construction of the two Hualong One units began in March and December last year.
Both those units are due to enter commercial operation by the end of 2026.Under development since 2010, the ACP100 integrated PWR's preliminary design was completed in 2014"
.https://www.world-nuclear-news.org/Articles/Foundation-completed-for-Chinese-SMR-turbine-build
- Forums
- ASX - By Stock
- BOE
- Nuclear Power
Nuclear Power, page-438
-
-
- There are more pages in this discussion • 1,064 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BOE (ASX) to my watchlist
(20min delay)
|
|||||
Last
$3.25 |
Change
-0.090(2.69%) |
Mkt cap ! $1.343B |
Open | High | Low | Value | Volume |
$3.40 | $3.41 | $3.25 | $8.091M | 2.442M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
31 | 81688 | $3.25 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$3.26 | 28205 | 25 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
38 | 38251 | 3.280 |
28 | 42125 | 3.270 |
24 | 79692 | 3.260 |
30 | 173901 | 3.250 |
15 | 50576 | 3.240 |
Price($) | Vol. | No. |
---|---|---|
3.290 | 28204 | 28 |
3.300 | 98514 | 19 |
3.310 | 57589 | 15 |
3.320 | 86404 | 13 |
3.330 | 25651 | 8 |
Last trade - 15.39pm 30/09/2024 (20 minute delay) ? |
Featured News
BOE (ASX) Chart |