Snowy pumped Hydro 2 isn't power plant as such it is only Battery.
They are planning to build $22Billoin + pumped hydro west of Mackay in the Eungella valley and that will also be only a battery that can only produce an expected 10-12 hours max. Great waste of $22b where you could build 24/7 greater capacity power station and have some change.
- Forums
- Political Debate
- Nuclear to cost $17b and twice as expensive as renewable energy
Snowy pumped Hydro 2 isn't power plant as such it is only...
-
- There are more pages in this discussion • 214 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Featured News
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online