    This article has some very interesting information in it.

    Read it and see what you think?
    http://chronicle.augusta.com/news/2017-02-18/plant-vogtle-could-use-new-fuel-when-mox-complete

    Posted February 18, 2017 10:47 pm - Updated February 18, 2017 11:06 pm
    By
    Thomas Gardiner
    Staff Writer
    Plant Vogtle could use new fuel when MOX is complete

    Column 1 Column 2 Column 3
    0      

    Cooling towers for Plant Vogtle Units 1 and 2 as seen from the Savannah River.

    Two major nuclear construction projects in the area are separated only by a river, wooded distance of about 13 miles, and by bureaucratic and materials science issues.
    Units 3 and 4 at Southern Nuclear’s Plant Vogtle and Savannah River Site’s mixed-oxide fuel fabrication facility are separated by government and private land almost entirely inaccessible to the general public, with a couple of minor exceptions.
    While the designs and purposes of each are entirely different, the commercial Plant Vogtle and the Department of Energy-run MOX facility could have entangled ties in the future.
    The MOX project is a product of a now-suspended nuclear weapons nonproliferation agreement between the U.S. and Russia.
    The agreement was signed in 2000, and construction began in 2007. The facility is intended to process weapons-usable plutonium, 34 metric tons under the agreement, and turn it into fuel for commercial nuclear reactors like those at Vogtle.
    In the early days of MOX, Duke Energy had signed up as a customer to purchase the fuel, but as delays and construction costs mounted, MOX was left with no foreseeable start date and zero customers.
    According to Areva Nuclear Materials LLC, one of the companies involved in MOX design and construction, the Energy Department planned for a subsidized cost structure to make the MOX fuel more attractive.
    Mixed-oxide fuel was meant to be lower than market costs for other forms of nuclear fuel to incentivize the destruction of former weapons-grade plutonium. Areva said the fuel is designed to perform the same as natural uranium in the reactors.
    A spokesman said global examples over the past three decades demonstrate that.
    Plant Vogtle, which could have four operating reactor units when the MOX plant is finished, could make the switch to the mixed-oxide fuel.
    According to Georgia Power spokesman Jacob Hawkins,
    “In order to accommodate the potential use of MOX fuel, modifications would be required for the plant’s physical structure, as well as the processes and procedures used to operate the facility.
    Georgia Power, which owns the largest share of Vogtle, said operating agreements with the other entities govern significant operation changes. However, it was unclear whether a fuel change would be subject to those agreements.
    Hawkins noted that Vogtle’s proximity to the MOX plant isn’t a major influential factor in determining future fuel purchases.
    Current fuel at Plant Vogtle uses Low Enriched Uranium rather than Highly Enriched Uranium . Cost of fuel is a factor, nuclear or otherwise, with any generation we use to serve our customers, and we consider those costs as part of our long-term planning process. All decisions we make regarding operations are driven by safety, compliance with regulations and our ability to provide our customers with reliable and affordable energy,” he said.
    Once the MOX facility is operational, purchase and transportation of the fuel would be subject to Nuclear Regulatory Commission licensing and regulations.

    However, prospects look grim for MOX.
    The facility was scheduled for completion in 2014, but Energy Department outlooks say the facility won’t be finished until after 2045. The original expected cost was around $5 billion, but the unfinished project has already reached that level, and costs are climbing.
    The contractor companies and the federal government overseeing construction don’t agree on completion percentages or future costs, either. Contract companies say the construction is around 70 percent complete, a number echoed by congressional lawmakers including Sen. Lindsey Graham, R-S.C., and Rep. Joe Wilson, R-S.C.
    The Energy Department claims it is about 30 percent complete.
    Aside from the disagreements, if the funding were made available and contractors were able to complete the MOX plant, the fuel could find use right here where it would be created.
    The local impact could benefit both defense nuclear processes at SRS and commercial production at Vogtle, if the switch can ever be thrown at the MOX facility.
    “Our company is always evaluating new technologies that could add value for our customers,” Hawkins said. “We stay informed of industry developments, including policy and regulations, and will support those activities if they serve the interests of our customers.”

    The MOX fuel that was to be used in the reactors originally was made up of Plutonium and depleted Uranium, I believe the reason why they are making modifications to the plants physical structure could be to accommodate this new method they are talking about below? but instead of enriching the Uranium to a higher degree, I wonder if they just remove the Nuclear poisons, also I reckon I know where the top up fuel could come from, could this be part of the sweetner by the DOE?

    http://www.world-nuclear.org/inform...ycle/fuel-recycling/mixed-oxide-fuel-mox.aspx

    An important and fundamental aspect of nuclear power is that, instead of just using the prepared nuclear fuel once and then dumping it as waste, most if it can be recycled, thus closing the fuel cycle. The current means of doing this is by separating the plutonium and recycling that, mixed with depleted uranium, as mixed oxide (MOX) fuel.


    Very little recovered uranium is recycled at present.

    Another way of closing the fuel cycle is to recycle all the uranium and plutonium without separating them, and topping up with some fresh uranium enriched to a higher level than usual.
    This is regenerated mixture (REMIX) fuel, is under development.

    In each case, the fission products and minor actinides are separated as high-level waste when the used fuel is processed.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
$4.25
Change
0.030(0.71%)
Mkt cap ! $1.011B
Open High Low Value Volume
$4.21 $4.38 $4.18 $2.661M 622.5K

Buyers (Bids)

No. Vol. Price($)
2 4284 $4.24
 

Sellers (Offers)

Price($) Vol. No.
$4.30 150 1
View Market Depth
Last trade - 16.10pm 01/07/2025 (20 minute delay) ?
SLX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.