NVA 15.4% 22.5¢ nova minerals limited

The heavey machinery only needs to be brought in once. It can...

  1. 582 Posts.
    lightbulb Created with Sketch. 918
    The heavey machinery only needs to be brought in once. It can come in on the snow road on floats over winter, if need be.

    of course it would be best if NVA can secure enough funding on good terms to build a year round road from the highway, no matter whgat type of operation we set up. It is possible they might. However, it certainly is possible to sustain a profitable small gold mine with just DC3s. A low power and low deisel consuption heap leach operation would be the way to go, one would think.

    With all the new equipment and processes they are talking about (crushing, ore sorting, milling, floating, ect) we are talking about a significant amount of more material handeling (deisel) and power (even more deisel?). We will for sure need a road for that.
 
watchlist Created with Sketch. Add NVA (ASX) to my watchlist
(20min delay)
Last
22.5¢
Change
0.030(15.4%)
Mkt cap ! $48.38M
Open High Low Value Volume
21.0¢ 22.5¢ 20.0¢ $4.457K 20.60K

Buyers (Bids)

No. Vol. Price($)
1 48815 20.0¢
 

Sellers (Offers)

Price($) Vol. No.
22.5¢ 4849 1
View Market Depth
Last trade - 16.10pm 04/07/2024 (20 minute delay) ?
NVA (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.