MIN 6.76% $51.18 mineral resources limited

It's quite difficult keeping tabs on the progress being made by...

  1. 446 Posts.
    lightbulb Created with Sketch. 288
    It's quite difficult keeping tabs on the progress being made by MIN in the Perth Basin.

    - Lockyer Deep 1 - Mar '22 - success
    - Lockyer 2 - April 23 - FAILED
    - North Erregulla Deep 1 - May 23 - success
    - Lockyer 4 - Drilled now - FAILED??
    - Lockyer 5 - Q1'24

    So is that a 50% strike/success rate?
    Was there a Lockyer 3?

    Could this be a looming problem for WA Govt, if the MIN success rate finding gas in the PB is a 50:50 chance and therefore a further supply crunch to AEMO forecasts?
 
watchlist Created with Sketch. Add MIN (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.