    There is no detail of what was to be delayed beyond the 31st March.

    Was it:

    A) the BFS
    B) the extension approval
    c) Finance

    Either way I'm pretty frustrated with they way things have been going. We need to begin construction asap so that we don't see these nuisance articles and speculation.

    If any one can ellaborate on the question above that would be great
 