Further as the company OGX has stated
The material Processed from the HIGHER GRADE MESTRE ZONE was also suspected of going to tails,
in edition to the 100 tonne BATCH MSM Re-sampled at 26.64 g p/t that when to tailings you can obviously establish
when high grade tailings are RE- processed their will be some stella extremely high grade area's within the tailings stockpile
these are just examples the company has made in recent ASX reports & as approx. 85% of the GOLD processed through the gravity
Gold processing facility went to tailings for a very prolonged period of time they were unlikely isolated events.
imo-gltah
salt
- Forums
- ASX - By Stock
- OGX
- OGX Tailings 30,000-Tonnes of High Grade Gold
OGX Tailings 30,000-Tonnes of High Grade Gold, page-3
- There are more pages in this discussion • 105 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)