Oh no ... the wind has stopped blowing., page-51

  1. 17,309 Posts.
    The CSIRO reports that to support renewables in the electricity generation space $1 trillion dollars is required to up grade the grid.

    Who will pay for this?

    The consumer of course. And it will cost a lot more than $100/month which is the amount that about 4% of the population are prepared to pay for this madness.

    More than 40% of the population don't want to pay a cent for the proposed measures.

    There's absolutely no chance this net zero scam will end in lots of tears, no chance at all. rolleyes.png
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.