Grade not only thing ordinary here.
Have heard the mining widths small. Less than 10m and therefore not a bulk minable operation. Strip ratio would therefore be too high. Grain size also FINE, leads to high grinding and processing costs. Can't imagine Rio welcoming them to use the port and other infrastructure in the area either.